Chaminade Preparatory School

Creve Coeur, MO

Cole is responsible for the site design to accommodate a new performing arts building/theatre including a new parking lot, access drives and additional pedestrian paths. The design includes a detention basin and bio-retention basin to meet current MSD water quality and detention requirements.

Problem Solved.

PLANNING   /   CIVIL ENGINEERING   /   SURVEYING   /   LANDSCAPE ARCHITECTURE

 
 
 
Powered by: Empoweren Website Content Management System